Boyd ISD selected E3 Entegral Solutions as its design-build partner for a comprehensive HVAC replacement program across all district campuses. Following a competitive qualifications-based selection process, E3 was awarded a $3,156,127 contract to address aging mechanical equipment and improve energy efficiency throughout the district’s facilities.
E3 conducted a complete facilities assessment across Boyd ISD’s five campuses: Boyd Elementary, Boyd Intermediate, Boyd Middle School, Boyd High School, and district auxiliary facilities, evaluating equipment condition, life-cycle status, and energy management opportunities. The resulting design-build scope was developed to minimize academic disruption while delivering long-term operational savings to the district.
The Comprehensive Project Included:
- Full HVAC life-cycle replacements districtwide
- Districtwide energy management system evaluation and optimization
- Turnkey engineering design and construction management
- Commissioning of all installed systems
- Performance management and M&V services
Procurement & Funding
The project was funded through Bond 2024 proceeds and procured through a competitive qualifications-based selection process. E3’s selection was based on demonstrated qualifications, relevant Texas K-12 project experience, and depth of technical team consistent with the district’s commitment to responsible stewardship of public funds.